Needed skid-steer work on a small property — pad prep and backfill after a retaining wall went in. They were in and out in about four hours, charged exactly what they quoted, and the grade was perfect.
Underground utilities in Bolivar, MO
Directional boring, fiber-optic installation, and vacuum excavation for Bolivar and Polk County.
T&C Underground installs underground utilities in Bolivar, Polk County, Missouri. Our shop is in Springfield, about 45 minutes from Bolivar. Every job includes a Missouri 811 locate pulled before we dig and restoration built into the quote.
Permitted bores under MoDOT-maintained routes through Polk County.
- County: Polk County
- ZIP: 65613
- Population: 10,200
- From our yard: about 45 min
See the full service area for the rest of the 417.
What we do in Bolivar
- Directional Boring (HDD): HDD (horizontal directional drilling) puts conduit, the protective pipe that carries cable or wire, and pipe under driveways, roads, and yards, with no open trench.
- Fiber-Optic Installation: Mainline routes, drops, and subdivision builds, with mule tape (a heavy-duty pull cord for the cable crew) pre-installed.
- Utility Plowing & Trenching: A vibratory plow (a blade that slices a narrow slot and pulls the pipe in behind it) for shallow runs. Open-cut trenching for tie-ins and deeper work.
- Vacuum Excavation & Potholing: Pressurized water, vacuum truck, clean hole. Know what's there before boring near it.
- Skid-Steer Dirt Work: Site prep, backfill, pad prep, spoil hauling. Fits through a 6-foot gate.
- Restoration & Cleanup: Seed, sod, asphalt patch. Built into the quote, not an afterthought.
Get a quote in Bolivar
Serving Bolivar (ZIP 65613) and the rest of Polk County. Tell us about your job and we'll come back with a real number.
Mon–Fri 7am–5pm · Missouri 811 compliant · Restoration included
What customers say.
Reviews from homeowners, developers, and ISP contractors across the 417 (southwest Missouri).
Getting a fiber drop to our rural home was a headache with every other contractor. T&C figured out the bore path, pulled the permit, did the job, and by 3pm we were done. Grass seed on the path, straw over it. Honest people.